Habitable room
Approved document F, Ventilation, suggests that a ‘habitable room’ is:
‘…a room used for dwelling purposes but which is not solely a kitchen, utility room, bathroom, cellar or sanitary accommodation.’
Whereas an ‘occupiable room’ is:
‘…a room in a building other than a dwelling that is occupied by people, such as an office, workroom, classroom or hotel bedroom, but not a bathroom, sanitary accommodation, utility room or rooms or spaces used solely or principally for circulation, building services plant or storage purposes.
Other definitions include:
- Approved document B, Fire Safety, Volume 2, Buildings other than dwellinghouses (2019 edition), defines a habitable room as: 'A room used, or intended to be used, for people to live in (including, for the purposes of Approved Document B Volumes 1 and 2, a kitchen, but not a bathroom).'
- Approved document M1, Access to and use of buildings: dwellings, defines a habitable room as: 'A room used, or intended to be used, for dwelling purposes, including a kitchen but not a bathroom or utility room.'
- The English Housing Survey Housing Stock Report, 2014-15, prepared by the Department of Communities and Local Government, defines a habitable room as: 'A room in the dwelling that offers ‘living accommodation’. Includes bedrooms, kitchens if there is additional space to provide a dining area large enough to accommodate a table and chairs (typically an area of 2m² in addition to kitchen space). A fully converted room in the loft space is classified as a habitable room even if it can only be reached by a fixed ladder or unsafe staircase.' This definition is repeated in The English Housing Survey, Profile and condition of the English housing stock, 2018-19, Published by the Ministry of Housing, Communities & Local Government in August 2020.
- The Scottish Building Standards refer to a 'principal habitable room' in relation to the provision of fire detection and fire alarm systems. They define a principal habitable room as ‘…a frequently used room by the occupants of a dwelling for general daytime living purposes.’
- The Home Quality Mark defines a habitable room as ‘…a room used for home purposes, but which is not solely a kitchen, utility room, bathroom, cellar or sanitary accommodation.’ Ref Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018. http://www.homequalitymark.com/standard
- BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited suggest that in relation to acoustic performance; '...habitable rooms include any room where individuals will sit or lie down and require a reasonably quiet environment in which to concentrate or rest. Such rooms are bedrooms, living rooms, dining rooms, studies as well as kitchen-dining and kitchen-living rooms.'
- Land measurement for planning and development purposes, Guidance Note, Global 1st edition, Published by the Royal Institution of Chartered Surveyors (RICS) in May 2021, states: ‘Different jurisdictions may define habitable rooms differently. Typically, habitable rooms provide the living accommodation of the dwelling. They include living room, dining room, study, home office, conservatory and bedrooms. They exclude the bathroom, WC, utility room, storeroom, circulation space and kitchen (unless it provides space for dining).’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.